Shadsworth Leisure Centre Demolition Bradley Group was contracted to carry out the demolition of the former Shadsworth Leisure Centre. The scope of the Shadsworth Leisure Centre Demolition Project included mechanical Read More »
Manchester Airport Terminal 2 Demolition The scope of works included an extensive soft strip demolition and removal of all materials within the original Terminal 2 structure, reducing the areas back Read More »